• SuZhou Saneco boiler co.ltd
    Alexander
    Credible suppliers
  • SuZhou Saneco boiler co.ltd
    Louis
    It's been a pleasure working with you
Contact Person : Sandy
Phone Number : +8615151590099
Whatsapp : +8615151590099

SA210A1 Tubes Steam Boiler Economizer For Waste Incinerator ODM

Place of Origin China
Brand Name Saneco
Minimum Order Quantity 20 tons
Packaging Details Steel frame
Delivery Time 80~120 days
Supply Ability 6000 tons/year

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Design Temperature 400℃ Manufacturing Level A
Fuels Coal Fired Thermal Efficiency Above 80%
Outlet Temperature 50-80℃ Porduct Name Boiler Economizer Banks
Usage Power Plant/CFB Boiler Color Customer's Requirement
Flue Gas Flow Rate 1000-100000Nm3/h Available Coal Fired Wood Biomass Burner
Installation Horizontal/Vertical Certificates ASME, TUV, SGS, CE, ISO9001, GRADE A
Keyword Boiler Economizer Working Pressure 1.0-2.5MPa
Packing Seaworthy Packing
Highlight

Boiler Economizer SA210A1 Tubes

,

ODM Boiler Economizer

,

steam economizer SA210A1 Tubes

Leave a Message
Product Description

SA210A1 Tubes Made Boiler Economizer With Shields For Waste Incinerator

 

Product Introdution

Economizer is a device installed at the lower part of the flue at the tail of the boiler to recover the waste heat of the exhaust gas. It heats the boiler feed water into a heating surface of saturated water under the pressure of the drum. Because it absorbs the heat of high-temperature flue gas, reduces the exhaust gas temperature, saves energy and improves efficiency, it is called an economizer.

 

Parameters of Boiler Economizer

 

Description Boiler economizer
Material Alloy steel, Carbon steel, SA210C ,SA213T22, etc.
Material standard ASTM, EN or ISO etc.
Dimension Customization
Weight

Min: 10 ton

Max.:1000 ton

   
Process Material→Tube Bending and Bevelling → Butt Welding→ Shield Manufacturing → Assembly 1 →RT→Handcuffs and Shields Welding→Assembly 2 →Hydro Test →Cleaning and Painting →Packing into Frames
   

SA210A1 Tubes Steam Boiler Economizer For Waste Incinerator ODM 0

 

 

Working Process of Boiler Economizer

 

There are three stages from the feed water in the boiler heated into superheated steam:feed water preheating, evaporation, and superheating. The three stages are finished on three different heating surfaces. The boiler steam and water circuit are composed of the three different heating surfaces as well as their connecting pipes. Boiler economizers are one of them, and it is right the equipment to preheat the feed water. Thus, it is the heating surface with the lowest temperature for boiler working fluid in the boiler steam and water circuit. The working fluid passing through this equipment is monophasic water(non-boiling economizer).

 

Company Profile

 

The products of our company have been widely used in major power plants of various provinces and cities in China, bringing stable and significant economic and social benefits to cooperated power plants. At the same time, we attach great importance to product development and strive to improve product quality. Through the cooperation with a number of domestic and foreign companies, we constantly explore the international market.

SA210A1 Tubes Steam Boiler Economizer For Waste Incinerator ODM 1