-
AlexanderCredible suppliers
-
LouisIt's been a pleasure working with you
High Efficiency Boiler Economizer with Max. 20t/h Steam Production and 5 Years Warranty for Core Components

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xType | Natural Circulation | Structure | Fire Tube And Water Tube |
---|---|---|---|
Pressure | Low / High Pressure | Steam Production | Max. 20t/h |
Style | VERTICAL | Fuel | Coal / Gas / Coal-fired / Water Heat |
Output | Hot Water / Steam | Material | Alloy Steel, Carbon Steel, SA210C, SA213T22 |
Material Standard | ASTM, EN Or ISO | Weight Range | 10 Ton - 1000 Ton |
Smelting Process | EF+LF+VD | Process | Material->Ingot->Hot/Cold-Rolling->Heat Treatment->Inspection->rough Machining->UT->2nd Heat Treatment->finishing Machining->Inspection |
UT Standard | ASTM A388 Or EN10228 | Surface Treatment | Painted |
Dimension | Customized | ||
Highlight | Max. 20t/h Steam Production Boiler Economizer,1 Year Warranty Boiler Economizer,5 Years Warranty for Core Components Boiler Economizer |
Boiler economizers are heat exchange devices with finned tubes that heat liquids (typically water) without exceeding the liquid's boiling point. We manufacture three types of boiler economizers:
- Bare tube economizer
- H-finned tube economizer
- Spiral finned tube economizer
The H-finned tube economizer is a highly efficient heat exchanger consisting of H-finned tubes. Compared to bare tube economizers, H-finned models offer:
- Expanded heat exchange area
- Reduced number of tubes required
- Increased flue gas flow area
- Reduced flue gas flow speed and abrasion
H-finned tubes can be manufactured as double H-finned tubes for enhanced rigidity in long tube rows. The spiral finned economizer features a new design with spiral fin tubes to overcome abrasion issues and extend service life.
The economizer's primary function is to reduce cooling costs by allowing compressor shutdown while maintaining adequate cooling capacity, resulting in significant energy savings.
Description | Boiler economizer |
---|---|
Material | Alloy steel, Carbon steel, SA210C, SA213T22, etc. |
Material standard | ASTM, EN or ISO etc. |
Dimension | Customization |
Weight | Min: 10 ton Max.: 1000 ton |
Smelting Process | EF+LF + VD |
Process | Material->Ingot -> Hot/Cold-Rolling-> Heat treatment (Normalizing+ tempering) -> Inspection ->rough machining->UT ->2nd Heat treatment ->finishing machining ->Inspection |
UT standard | ASTM A388 or EN10228, etc |

Zhangjiagang Hua Dong Boiler Co., Ltd., founded in 1985, specializes in manufacturing power station boilers, industrial boilers, HRSGs, waste incineration boilers, biomass boilers and related heating surface components. We provide comprehensive services from design and manufacturing to installation and maintenance.


38 years experience in industry research, development and manufacturing with sufficient production capacity.



- Impact test and Strength calculation report with applied materials information
- 100% NDT (non-destructive inspection) report of steel plate, tube and electrode
- X-ray, γ-ray and liquid penetrant test inspection report (welding seam)
- Hydraulic test report to ensure standard working pressure and safety

Complete quality assurance and control system certified to International Quality Standards. Our quality assurance system complies with national regulations and standards, ensuring 100% control over processes and products through stringent material and product inspections during manufacturing.

For special cargos (overlength, overwidth, overheight, overweight), we use frame boxes for easy handling.

For regular goods, we prefer standard containers.

All goods are reinforced after loading for secure transportation.
ISO 9001: 2015; CE certificate; EN ISO 3834-2; ASME certificate with "S", "U" and "NB" stamps, etc.






We provide 18 months warranty for all spare parts (excluding fragile parts).
- All machines comply with ISO quality and CE system requirements
- Each procedure is executed by professional skilled labor with dedicated QC
- All product information is tracked in our efficient management system
CFB Boiler, HRSG Boiler, Boiler Economizer, Boiler Fin tube, Boiler Air preheater, Boiler superheater, Boiler membrane wall, Boiler manifold headers and other pressure spare parts.
Before sales:
Product information, market research forecasting, product customization, product processing, consultation and other services.
After sales:
- Technical training according to customer requirements
- Warranty replacements
- Maintenance spare parts supply
- Regular customer follow-up
- Prompt response to complaints and consultations
Delivery Terms: FOB, CFR, CIF, EXW, FCA
Payment Currency: USD, CNY
Payment Type: T/T, L/C, MoneyGram, Western Union, Cash
Language Spoken: English, Chinese
We are a factory located 130km (2 hours by car) from Shanghai Airport. We offer pickup service at Shanghai for your visit.